Stand out with the ability to set the parameters on-site
Parameters include a programmable number of tripping cycles, current, over voltage and under voltage protection. Single phase PTS-iACCL is built with a separate control for power and lightning load to reduce wiring cost.

INTELLIGENT TRIPPING
Continuous phase monitoring and faster trip time for high overload conditions.

SUPPLY AVAILABILITY
Operate the load using mains supply once it’s available.

FAILURE DETECTION
Automatically detect the mains failure and initiate the changeover while avoiding the abrupt loading of a generator.

FAST RESTORATION
Automatically transfer loads within 5 seconds to the mains supply.